Monday 23 December 2024
 
»
 
»
Story

Enova unveils solar plant at Mall of the Emirates

DUBAI, May 13, 2018

Majid Al Futtaim, the leading shopping mall, communities, retail and leisure pioneer across the Middle East, Africa and Asia region, has joined forces with Enova, a leading energy and facilities management specialist in the Middle East, to launch the first phase of solar photovoltaic (PV) plant at Mall of the Emirates in Dubai.

The project is set to generate 3 GW of ‘clean’ energy, thus leading to Dh1.4 million ($381,093) savings on energy costs every year.

Led by Enova, a total of 7,291 photovoltaic panels were fitted to 1,068 carports. Spanning over 11,996 sq m, the plant is equivalent to the size of nearly two football fields. The retrofit of the premises’ existing car-park structure is a regional first.

"Mall of the Emirates’ renewable energy plant brings Majid Al Futtaim one step closer to our commitment to become ‘Net Positive’ in carbon and water by 2040," remarked Ibrahim Al'Zubi, the chief sustainability officer at Majid Al Futtaim-Holding.

"This new solar PV plant is set to reduce 2,500 tonnes of carbon dioxide (CO2) emissions every year, equivalent to taking 480 cars off the road," noted Al'Zubi.

Enova CEO Anne Le Guennec said: "We encourage our clients to take a step further in their energy performance strategies by supporting them to not only implement energy conservation measures for increased energy efficiency, but also generate their own energy through on-site solar photovoltaic plants."

"We are a strong partner throughout the solar project lifecycle, from the conception with transparent feasibility studies, to the operation and maintenance with real-time monitoring after the solution installation," noted Le Guennec.

"This integrated approach allows us to guarantee the performance and savings promised, so that our clients can achieve their ambitious sustainability targets while growing their business at the same time," she explained.

According to her, the project is part of an initiative between Enova and Majid Al Futtaim’s Shopping Malls business unit to install solar PV to power three of its retail destinations by 2018.

The objective is to source a minimum of 7.5 per cent of energy use on site via renewable energy at all new developments and a minimum of 5 per cent in existing buildings, said Le Guennec.

"The work was completed in 10 weeks and the shopping centre remained fully operational throughout, resulting in minimal disruption to customers at one of the UAE’s busiest malls," he added.-TradeArabia News Service




Tags: Mall of the Emirates | Solar plant | Enova |

More Energy, Oil & Gas Stories

calendarCalendar of Events

Ads