Pumping resumed in Iraqi oil pipeline to Ceyhan
ISTANBUL, March 31, 2015
Crude flow in the Iraqi pipeline carrying Kirkuk and Kurdish oil to Turkey's Mediterranean port of Ceyhan resumed after a technical problem was fixed, an official at Turkish state pipeline operator Botas told Reuters.
The pipeline was pumping around 425,000 barrels per day (bpd) before it was halted.--Reuters